NY Arena’s Hot Water Issues were Leaving Players Cold

Industry

Stadiums and Fields

Customer

Professional Hockey Arena
New York

Product Installed

Sales Representative

R.P. Fedder

Share this Product


What the Customer Needed

This professional hockey arena had a serious hot water problem. The facility’s system—two copper fin heaters rated for 2045 MBH, 81% efficiency, and feeding a 1,500-gallon storage tank—was simply not up to the job. The heaters fell completely short during peak times in the arena…namely, 20 minutes before a game, when concession stands were preparing food; and 20 minutes after the game, when stands were cleaning up and players were showering. Players and employees complained, constantly… whether in the locker room or the kitchen, cold water doesn’t cut it. Worse still, the systems were frequently breaking down and nearing the end of their life.

AERCO's Solution

The arena asked R.P. Fedder Corp. to evaluate its replacement options. Its new owner was investing $7 million in the facility, with a portion of that budget allocated to upgrade the hot water heaters. The client had a simple goal: Never run out of hot water again. R.P. Fedder recommended six AERCO Innovation 1060s. The Innovation 1060s delivered the perfect combination of performance and economy—96% efficiency, tankless design, a small footprint, zero-side clearance installation and flexible venting:

  • The six Innovation units were installed just before the hockey season started.
  • The units took up considerably less floor space—three Innovations were installed in the same footprint as a single copper fin.
  • At 96% efficiency, the Innovations had nearly double the effective output of the heaters they replaced. In fact, only four of the six Innovations are required at peak load. The remaining two units provide redundant excess capacity, so hot water is always available.
  • With a brand new roof installed at the arena, no one wanted to add multiple, large vent holes for six new water heaters. No problem… the Innovations were common breeched into one flue, so only one 14” vent hole was needed.

Results / Return on Investment

The project was on budget and installed easily. And with more than enough hot water for everyone, every time, there hasn’t been a single complaint since.